Commercial Fire Sprinkler System Plans Review (R0263)
Curriculum: Fire Prevention: Technical
Learn to perform commercial fire sprinkler system plan reviews to evaluate sprinkler fire protection system calculations in accordance with nationally recognized standards for design & installation.
1/15/2024 - 1/19/2024
in Emmitsburg, MD
Availability: Wait List Opportunity
Fire Inspection Principles 2: Inspection of Structures and Systems (R0391)
Curriculum: Fire Prevention: Technical
Learn about the fundamental methodology for application of the requirements for fire protection systems including fire alarm and fire suppression systems (detection, notification and extinguishment).
3/10/2024 - 3/15/2024
in Emmitsburg, MD
Availability: Wait List Opportunity
Fire Inspection Principles I (R0390)
Curriculum: Fire Prevention: Technical
Get introduced to the fundamental methodology for the application of fire and life safety codes and standards, with a focus on essential methodologies and current code enforcement applications.
10/15/2023 - 10/20/2023
in Emmitsburg, MD
Availability: Wait List Opportunity
Hazardous Materials Code Enforcement (R0615)
Curriculum: Fire Prevention: Technical, Hazardous Materials
Learn to recognize and analyze hazardous materials risk, classify the materials, and apply the codes, standards and regulations to prevent incidents and mitigate threats to life and property.
10/22/2023 - 10/27/2023
in Emmitsburg, MD
Availability: Wait List Opportunity
Plan Review of Fire Alarm System Installations (R0264)
Curriculum: Fire Prevention: Technical
Learn how to conduct plan reviews of fire alarm system installations with a rigorous, systematic approach, including a review of codes that affect where detection is required and how to provide it.
1/22/2024 - 1/26/2024
in Emmitsburg, MD
Availability: Vacancies
Plans Review for Fire and Life Safety (R0393)
Curriculum: Fire Prevention: Technical
Learn to verify that construction documents comply with applicable building and fire codes for fire protection and life safety requirements, including reviews of architectural drawings and site plans.
1/7/2024 - 1/12/2024
in Emmitsburg, MD
Availability: Wait List Opportunity
Strategic and Tactical Considerations for Fire Protection Systems (R0396)
Curriculum: Fire Prevention: Technical
Learn the procedures Incident Commanders use to conduct pre-incident planning for target hazards to determine the fire protection systems that may be needed during a fire or related emergency.
7/7/2024 - 7/12/2024
in Emmitsburg, MD